CU MONG TUNNEL PROJECT
OVERVIEW
Cu Mong tunnel is belong to the road tunnel project passing Deo Ca (including Deo Ca tunnel, Co Ma tunnel and Cu Mong tunnel). The total length of the route is 6,62km (new route), with the starting point at KM1239+119 National Highway 1 (Binh Dinh), ending point at tại KM1247+739 National Highway 1 (Phu Yen). The tunnel is 2.600m long, leading road is 4.020m long, on the route there are 2 brigde with total length of 36m. The leading road is designed following road standard level III (TCVN 4054-2005), designed speed is 80km/hour. Cu Mong tunnel is designed according to scale of the Deo Ca tunnel.
Cu Mong tunnel route was constructed in BOT form with phasing investment plan. Phase 1 includes construction of 2 tunnels according to the scale of Deo Ca tunnel, completion to put one tunnel into operation, the other tunnel will be used as refuge tunnel. The leading road is 20,5m wide but including 2 lanes with safety strip for the total width of 11m. The total investment for this project is 4.627 billion Vietnamdong.
Expectedly, in the end of 2018 all the equipment, ITS system, fire protection system, water supply and ventilation will be completed. In early 2019 the tunnel will be put into operation.
Cu Mong Tunnel traffic monitoring solution includes:
– Tunnel door toll collection system
– Traffic information board system
– Communication systems
– Oversized vehicle detection system
– Camera surveillance system
– Speed monitoring system in tunnel