SMART TRANSPORTATION PROJECT & INTEGRATION IN TRANSPORTATION

PROJECT COMPLETED

Nui Vung Tunnel on Cam Lam – Vinh Hao Expressway

Supply, installation of equipment, and deployment of ITS software for the Nui Vung Tunnel under the Cam Lam – Vinh Hao Expressway Investment Project, including:

  • ITS software system for management and operation of road tunnels and highways
  • Tunnel door control barrier system and static signal lights
  • Radio information system (Radio), emergency telephone system (SOS), public address system (PA)

Da Nang - Quang Ngai Expressway

Supply and installation of an Electronic Toll Collection (ETC) system under the closed-toll model for the Da Nang – Quang Ngai Expressway Project, including 30 ETC lanes at:

  • Tuy Loan Toll Station
  • Phong Thu Toll Station
  • Ha Lam Toll Station
  • Tam Ky Toll Station
  • Chu Lai Toll Station
  • North Quang Ngai Toll Station
  • Quang Ngai Toll Station

Ho Chi Minh City – Long Thanh – Dau Giay Expressway

Supply and installation of an Electronic Toll Collection (ETC) system under the closed-toll model for the Ho Chi Minh City – Long Thanh – Dau Giay Expressway Project, including more than 30 ETC lanes at:

  • Long Phuoc Toll Station
  • Dau Giay Toll Station
  • National Highway 51 Toll Station
  • Toll Station Ring Road 3 Interchange

Trung Luong - My Thuan Expressway

Supply and installation of an Electronic Toll Collection (ETC) system (20 ETC lanes) under the closed-toll model, including automatic IC issuance, Variable Message Signs (VMS), and an automatic vehicle classification system, for the Trung Luong – My Thuan Expressway Project in Tien Giang Province. The scope covers toll stations and the operations control center at:

  • Than Cuu Nghia Toll Station
  • Cai Lay toll station
  • Cai Be Toll Station
  • An Thai Trung Toll Station and An Thai Trung Operation Center

An Suong – An Lac Toll Station

Supply and installation of an Electronic Toll Collection (ETC) system under the open-toll model on National Highway 1, including 25 ETC lanes.

Bac Giang – Lang Son Expressway

Supply and installation of an Electronic Toll Collection (ETC) system (20 ETC lanes) under the closed-toll model, including automatic IC issuance, Variable Message Signs (VMS), an automatic vehicle classification system, and an automatic recognition camera system, for the Bac Giang – Lang Son Expressway Project. The scope covers 34 ETC lanes at:

  • 12 lanes (11 ETC+MTC lanes, 1 MTC lane)
  • 22 exit lanes (20 ETC+MTC lanes, 2 MTC lanes)

Toll station on Hanoi Highway

Supply and installation of an Electronic Toll Collection (ETC) system (16 ETC lanes) under the open-toll model on Hanoi Highway (Vo Nguyen Giap Highway).

Cu Mong Tunnel Traffic Monitoring Solution

Providing Cu Mong Tunnel traffic solutions including:

  • Tunnel toll collection system
  • Traffic information board system
  • Communication system
  • Oversized Vehicle Detection System
  • Surveillance camera system
  • Speed ​​monitoring system in tunnels

Traffic monitoring solution Hai Van Tunnel 2

Providing Hai Van Tunnel traffic solutions including:

  • Oversized Vehicle Detection System
  • Surveillance camera system